Horizontal directional drilling in Siberia

ADVANTAGES OF HDD
Thanks to HDD your money and time costs would be minimal!

A drilling rig instead of an excavator guarantees minimal disruption of the territory, preservation of the road surface and natural landscape.


Performing work using horizontal directional drilling is five times faster than the “open method”.


The technology will make it possible to lay the pipeline along the shortest route.

ABOUT US
11 years experience
in Krasnoyarsk region, Irkutsk, Kemerovo, Novosibirsk regions, Republic of Buryatia.

Objects of varying complexity:
◉ Largest service and network providers
◉ Small construction and trading companies
◉ Industrial facilities
◉ Federal communications
◉ Housing complexes and private houses
◉ Underwater communications

We have already laid more than 100 kilometers of pipes with a diameter of up to 1000 mm, using modern
drilling rigs and location equipment from the world's leading manufacturers as well as
own fleet of auxiliary equipment.

We follow the development of the industry, send our specialists to trainings in working with new bentonites and to a mandatory annual advanced training.
OUR SERVICES
◉ plumbing
◉ gas pipeline
◉ communication cable
◉ electrical cable
◉ gravity sewerage
◉ pressure sewerage
◉ storm drainage
Possible pipe diameter is from 20 to 700 mm.
Climatic conditions from -17°С to +40°С
SOILS: clay, loam, sand, ASG.
EXAMPLES OF OUR PROJECTS
Sorting station Zykovo, Krasnoyarsk region

Puncture length 190m

ASG soil

Package of 4 pipes with a diameter of 110 m

The project was completed in 4 days

Water pipeline under the federal highway P258, Irkutsk region

Puncture length 50m

Soil sedimentary rock

Case with a diameter of 400mm

The project was completed in 4 days

Cable line for the Bratsk aluminum smelter, Irkutsk region

Puncture length 70m

Loam soil

Two cases with a diameter of 530mm

The project was completed in 10 days

Water supply for the residential complex “AivazovSKY”, Krasnoyarsk

Puncture length 500m

Loam soil

Main pipe with a diameter of 225mm

The project was completed in 7 days

Main sewer collector, Irkutsk region

Puncture length 100m

Mixed soil

Pipe diameter 530mm

The project was completed in 5 days

Water supply in the Gorny village, Krasnoyarsk Region

Length 1km

Soil coarse sand

Pipe diameter 110mm

The project was completed in 12 days

COOPERATION TERMS
◉ You determine the scope of work - only drilling or a turnkey project, including installation of wells.

◉ You choose the form of payment – ​​cash, non-cash.

◉ We promptly go to the site any day of the week.

◉ We provide an accurate estimate of the timing and cost of work.

◉ We find the shortest path and the right solution based on geology and existing communications, preserving the infrastructure.

◉ We are responsible for the safety, compliance with requirements and reliability of the delivered objects.
CONTACTS
Individual Entrepreneur Plokhaia Ekaterina Aleksandrovna
Taxpayer Identification Number: 246504703491
Primary State Registration Number: 324246800104978
Address: 662518, Russia, Krasnoiarskii Krai, Berezovskii raion, selsovet Esaulskii,
ter. DNT Bolshaia Poliana, Iagodnaia, 36
Russian Central Bank Identification Code: 044525411 BANK VTB (PJSC)
Account: 40802810512840001666
Correspondent account: 30101810145250000411
  • + 7 (391) 214-69-96

    Hddsib@yandex.ru
Made on
Tilda